IFR Checkride Guide
← Area VI. Instrument Approach Procedures

Task VI.E

Landing from an Instrument Approach

To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with performing procedures for a landing from an instrument approach.

Note: For non-amphibious seaplanes, this task applies only when the applicant has immediate access to an instrument approach to a waterway.

References: 14 CFR parts 91; AIM; FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-15, FAA-H-8083-16, FAA-H-8083-25; POH/AFM

Quick Review

Conversational Q&A — quiz yourself before the oral.

Deep Dive

What you'll actually see at minimums

The runway rarely appears as a runway. It appears as pieces — and the pieces have an order.

Straight-in versus circling arrival

The last gate: checklist and control

Official ACS elementsreference

Knowledge3 elements

The applicant demonstrates understanding of:

  • IR.VI.E.K1Elements related to the pilot’s responsibilities, and the environmental, operational, and meteorological factors that affect landing from a straight-in or circling approach.
  • IR.VI.E.K2Airport signs, markings, and lighting, including approach lighting systems.
  • IR.VI.E.K3Appropriate landing profiles and aircraft configurations.
Risk Management4 elements

The applicant is able to identify, assess, and mitigate risk associated with:

  • IR.VI.E.R1Attempting to land from an unstable approach.
  • IR.VI.E.R2Flying below the glidepath.
  • IR.VI.E.R3Transitioning from instrument to visual references for landing.
  • IR.VI.E.R4Aircraft configuration for landing.
Skills5 elements

The applicant exhibits the skill to:

  • IR.VI.E.S1Transition at the DA/DH, MDA, or visual descent point (VDP) to a visual flight condition, allowing for safe visual maneuvering and a normal landing.
  • IR.VI.E.S2Adhere to all ATC or evaluator advisories, such as NOTAMs, windshear, wake turbulence, runway surface, and other operational considerations.
  • IR.VI.E.S3Complete the appropriate checklist(s).
  • IR.VI.E.S4Maintain positive airplane control throughout the landing maneuver.
  • IR.VI.E.S5Use single-pilot resource management (SRM) or crew resource management (CRM), as appropriate.